/
PwsStandardTaskTypeRef
PwsStandardTaskTypeRef
Overview
This structure represents the unique key fields of a standard task type. Standard task types are used to categorize project task types. Standard task types can be identified by StandardTaskTypeCode, StandardTaskTypeName or StandardTaskTypeUid.
Format
PwsStandardTaskTypeRef
- PwsStandardTaskTypeRef
- StandardTaskTypeCode: String (20)
- StandardTaskTypeId: Int32
- StandardTaskTypeName: String (50)
- StandardTaskTypeUid: Int64
Elements
Element | Data Type | Description | Sample Data |
---|---|---|---|
StandardTaskTypeCode | String (20) | The code is a unique identify of standard task type. | T3 |
StandardTaskTypeId | Int32 | The standard task type id is a unique identifier for a project role. For internal use only. | |
StandardTaskTypeName | String (50) | The name is a unique identify of standard task type. | Design |
StandardTaskTypeUid | Int64 | A unique and immutable identifier for a standard task type. | 1152921504606847727 |
Usage Example(s)
, multiple selections available,
Related content
PwsProjectTaskTypeSummary
PwsProjectTaskTypeSummary
More like this
PwsProjectTaskTypeRef
PwsProjectTaskTypeRef
More like this
PwsProjectTaskTypeDetail
PwsProjectTaskTypeDetail
More like this
PwsTaskType
PwsTaskType
More like this
PwsProjectProjectTaskTypes
PwsProjectProjectTaskTypes
More like this
PwsProjectTaskTypeElement
PwsProjectTaskTypeElement
More like this