PwsProjectTimeBaselineSummary

Overview


This structure includes basic information about a project time baseline. The information represented in this structure is not comprehensive and only includes certain key attributes of a project time baseline deemed to be useful in a listing of project time baselines.

Format


PwsProjectTimeBaselineSummary
  • PwsProjectTimeBaselineSummary
    • ExternalSystemIdentifier: String (50)
    • ProjectTimeBaselineId: Int32
    • ProjectTimeBaselineUid: Int64
    • ActiveProjectTimeBaselineFlag: Boolean
    • BarMetricActiveFlag: Boolean
    • ChgMetricActiveFlag: Boolean
    • CrMetricActiveFlag: Boolean
    • Description: String (1000)
    • HrsMetricActiveFlag: Boolean
    • PrimaryMetric: String
    • ProjectTimeBaselineName: String (50)
    • RdcMetricActiveFlag: Boolean

Elements


Element

Data Type

Required?

Default

Description

Sample Data

ExternalSystemIdentifier

String (50)

One of ExternalSystemIdentifier or ProjectTimeBaselineUid is required


The external system identifier is a unique identifier for a project time baseline.


ProjectTimeBaselineId

Int32

No


The project time baseline id is a unique identifier for a project time baseline. For internal use only.    


ProjectTimeBaselineUid

Int64

See ExternalSystemIdentifier


A unique and immutable identifier for a project time baseline.

1152921504607411677

ActiveProjectTimeBaselineFlag

Boolean

On Insert: No

On Update: No 

Defaults to false on create, must be same as existing on update, or null

If set to 'true', the project time baseline referenced by this web service is set as the active project time baseline.

true


BarMetricActiveFlag

Boolean

On Insert: At least one of BarMetricActiveFlag, ChgMetricActiveFlag, CrMetricActiveFlag, HrsMetricActiveFlag and/or RdcMetricActiveFlag is required

On Update: No

Defaults to false on create, must be same as existing on update, or null 

If set to 'true', billing adjusted revenue is set as a project time baseline metric.

true

ChgMetricActiveFlag

Boolean

See BarMetricActiveFlag

Defaults to false on create, must be same as existing on update, or null  

If set to 'true', chargeable hours is set as a project time baseline metric.

true

CrMetricActiveFlag

Boolean

See BarMetricActiveFlag

Defaults to false on create, must be same as existing on update, or null  

If set to 'true', contract revenue is set as a project time baseline metric.

true

Description

String (1000)

On Insert: No

On Update: No  


The project time baseline description.

Task Plan Baseline


HrsMetricActiveFlag

Boolean

See BarMetricActiveFlag 

Defaults to false on create, must be same as existing on update, or null 

If set to 'true', hours is set as a project time baseline metric.

true


PrimaryMetric

String

On Insert: Yes

On Update: No


The primary metric for the project time baseline:

"B" for billing adjusted revenue

"C" for contract revenue

"R" for resource direct cost

"G" for chargeable hours (note: actually specified in minutes)

"H" for hours (note: actually specified in minutes) 

B


ProjectTimeBaselineName

String (50)

On Insert: Yes

On Update: No 


The project time baseline name.

Time Baseline A


RdcMetricActiveFlag

Boolean

See BarMetricActiveFlag

Defaults to false on create, must be same as existing on update, or null  

If set to 'true', resource direct cost is set as a project time baseline metric.

true


Usage Example(s)


Example 01
                    <b:PwsProjectTimeBaselineSummary>
                        <b:ExternalSystemIdentifier i:nil="true"/>
                        <b:ProjectTimeBaselineId i:nil="true"/>
                        <b:ProjectTimeBaselineUid>1152921504607411677</b:ProjectTimeBaselineUid>
                        <b:ActiveProjectTimeBaselineFlag>true</b:ActiveProjectTimeBaselineFlag>
                        <b:BarMetricActiveFlag>true</b:BarMetricActiveFlag>
                        <b:ChgMetricActiveFlag>true</b:ChgMetricActiveFlag>
                        <b:CrMetricActiveFlag>true</b:CrMetricActiveFlag>
                        <b:Description>Task Plan Baseline</b:Description>
                        <b:HrsMetricActiveFlag>true</b:HrsMetricActiveFlag>
                        <b:PrimaryMetric>B</b:PrimaryMetric>
                        <b:ProjectTimeBaselineName>Time Baseline A</b:ProjectTimeBaselineName>
                        <b:RdcMetricActiveFlag>true</b:RdcMetricActiveFlag>
                     </b:PwsProjectTimeBaselineSummary>