view default rate and override billing rate or internal rates

...

Tip
titleAdditional Resources
  1. Topic of the Day: Rate Management Webinar provides an overview of the rate structures in Projector. (go to 36:30)

This is a subtab of the Role Editor. You will need to open the role editor to access it. Please see the Role Editor documentation for a list of locations that provide access.

Image RemovedImage Added

Permissions and Settings

...

Tip

Updating rates does not affect existing, approved time cards. You will need to revalue them through either a pre-invoicing adjustment or an invoicing adjustment to use the new rates.


Image RemovedImage Added


Billing Title

It is common for companies to book employees on work that is different from their title. For example, you may have a junior developer doing the work of a senior developer, and billing as such.

Image RemovedImage Added

Radio ButtonDescription
Base rates on resource's titleUse this option when you want the rates as defined by the project and the resource's default department/title
Override billing rate to

Select this option to have the resource work under a different title than their own. The billing rates will change to correspond to the new title. This title can be displayed on a Projector invoice.

...

Each row of the grid represents a date range and the rates in effect for those dates. By default there is one row for all of time that inherits from the Billing Title defined above.

Image RemovedImage Added

Column

Description

Base Rates on

  • Resource Title – The rate for this resource's title on the rate card selected for this project.
  • Specific Title – The rate for a different title on the rate card selected for this project.

Begin Date

This is the date that the rate becomes effective for the resource on this project. The begin date for the very first rate will be shown as <-- , which means that it applies to all times prior to and including the end date. All of the subsequent rates begin on the day that follows the end date of the previous rate entry. Rates may not have overlapping dates.

End Date

This is the last date that the selected rate card is applied to this project. The end date for the very last rate card will be shown as -->, which means that it applies to all times in the future, until further notice.

Rate Card

Open the drop-down menu to choose a rate card for this period. Rate overrides will be displayed as <<Rate Override>>.

Contract Discount %

Enter a positive or negative percentage to discount the selected rate card for the designated time period, if desired.

Billing Adjusted Discount %

Enter a positive or negative percentage to discount the selected rate card for the designated time period, if desired.

Title

The title from which the hourly rate will be used for this role on the project.

Contract Hourly Rate

The hourly contract rate for time entered by this role.

Contract Daily Rate

The daily contract rate for time entered by this role.

Billing Adjusted Hourly Rate

The hourly rate that the client will be charged for this role on the project.

Billing Adjusted Daily Rate

The daily rate that the client will be charged for this role on the project.

Add RowClick the Override Billing Rates button discussed above. This does not update time cards that are already approved.
Edit RowClick the Edit button on this row. This does not update time cards that are already approved.
Delete RowClick the Delete button on this row. This does not update time cards that are already approved.

...

The grid displays one row for each overridden date range. The arrows, <-- and -->, are for all past time or all future time.

Image RemovedImage Added


Override RDC Rate

Click the Override RDC Rates button to add a new row to the table. Or click the Edit button to modify an existing row. The following form is shown. 

Image RemovedImage Added

ControlDescription
From / ToLeave the From or To dates blank to leave an open ended date range. You can leave both blank to specify all of time. 
RDC RateIn the first box indicate the numeric rate. In the dropdown select the desired currency.

...

With regards to revenue routing on the Project Advanced Setup Tab - there are some considerations to be made. If you choose to route revenue to different cost centers on that tab, it does not have any effect the routing you define here. It would technically be possible to route everything outside of the engagement and resource cost centers to a third cost center - meanwhile the transfer rates according to this role would still be happening. That would be a highly unusual situation. You should typically have the advanced tab routing revenue and RDC to engagement and resource cost center's respectively. 

Image RemovedImage Added