This structure represents the fields associated with a project cost baseline bucket. A project cost baseline will contain a collection of baseline buckets. All buckets in the same cost baseline share the same baseline-level attributes, such as the dimension, the primary metric and the active metrics. These common attributes are defined in the PwsProjectCostBaselineDetail or PwsProjectCostBaselineElement structures. The overall baseline starting and ending dates, as well the the bucket size (daily, weekly, monthly, etc) are also defined at the baseline level. The start and end dates on each bucket must correspond to expected boundary start and end dates per the baseline parameters.
Format
Panel | ||
---|---|---|
| ||
|
...